Our “Outdoor Contactor” prototype successfully wrapped operations this past October. After our initial run in the summer/fall of 2011, a big goal for us this year was to log performance data in a continuous, long-term operation mode. It took a lot of effort from the...

We have had a very successful season with our outdoor contactor prototype. After our installation and start-up procedures in August, we were able to accumulate well over 500 hours of air ingestion as we progressed through packing conditioning and CO2 absorption stages. In October, we...

July and August 2011 have been very exciting months here at CE! For the past year, one of our principal efforts as a team has been the design, engineering, and fabrication of our “Outdoor Contactor” (OC) prototype. The OC has been designed to test critical...